Extend Your Home Without Planning Permission

Many homeowners in the UK can build extensions without applying for planning permission, thanks to Permitted Development (PD) rights. However, these rights come with specific conditions and limitations.

This guide covers the key rules for different types of extensions under PD rights. Always remember that these are general guidelines - your property may have additional restrictions if it's listed, in a Conservation Area, or has had PD rights removed.

Last Updated: April 2025

This guide reflects current regulations for England as of April 2025. Rules in Wales, Scotland, and Northern Ireland may differ. Always check with your local planning authority for the most up-to-date information specific to your area.

Types of Extensions Under Permitted Development

Under PD rights, you may be able to build the following types of extensions:

Rear Extensions

Single-storey rear extensions are the most common type of household extension under PD rights. Their permitted size depends on your house type:

House Type Standard PD Allowance Larger Homes Scheme
Detached house 4 meters 8 meters
Semi-detached or terraced 3 meters 6 meters

Note: The "Larger Homes Scheme" (formerly known as the "Prior Approval" or "Neighbour Consultation Scheme") requires you to notify the council, who will consult your adjoining neighbors. If they object, the council will assess if the extension would have an unacceptable impact.

Diagram showing permitted development limits for rear extensions

Diagram showing maximum rear extension depths under PD rights

Key Limitations for Rear Extensions:

  • Maximum height of 4 meters for single-storey extensions
  • If within 2 meters of a boundary, maximum eaves height of 3 meters
  • Cannot cover more than 50% of the land around the original house
  • Materials should be similar in appearance to the existing house
  • No verandas, balconies, or raised platforms
Practical Tip

When measuring the "original house," remember this means the house as it was first built or as it stood on July 1, 1948 (if built before this date). Any previous extensions must be counted in your "50% of land" calculation, even if they were built by previous owners.

Side Extensions

Side extensions are an excellent way to add width to your home under PD rights, often used to create wider kitchens, utility rooms, or garages.

Key Rules for Side Extensions:

  • Single storey only
  • Maximum width: no more than half the width of the original house
  • Maximum height: 4 meters
  • Maximum eaves height: 3 meters (if within 2 meters of a boundary)
  • Cannot be on the side that faces a highway (usually the front, but for corner plots, this would include the side road)
Diagram showing permitted development limits for side extensions

Side extension maximum width limitations under PD rights

Common Side Extension Projects:

Garage Conversion + Extension

Converting an existing garage and extending it to create a larger kitchen/family room.

Utility/WC Extension

Adding a narrow side extension for a utility room, downstairs toilet, or pantry.

New Integral Garage

Building a new garage to the side of the house under PD rights.

Common Pitfall

When calculating the "half-width" rule, measure the width of the original house, not including any previous extensions. For terraced houses, measure from the center of the party wall to the outer edge of the opposite wall.

Two-Storey Extensions

Two-storey (or first-floor over existing) extensions can also qualify for PD rights, but have stricter limitations than single-storey extensions.

Key Rules for Two-Storey Extensions:

  • Maximum projection beyond the rear wall: 3 meters
  • Minimum distance from boundary: 7 meters
  • Roof pitch should match the existing house
  • Cannot include a balcony, veranda, or raised platform
  • Side-facing windows above ground floor must be obscure-glazed with openings 1.7m above floor level
  • Must be in matching materials
Diagram showing permitted development limits for two-storey extensions

Two-storey extension rules under PD rights

Important Consideration

Two-storey extensions cannot be used on the side of a property that faces a highway. They're mainly suitable for extending to the rear, and only when your property is at least 7 meters from the rear boundary.

Popular Two-Storey Configurations:

  • Kitchen extension with bedroom above: Extending your kitchen/dining space with an additional bedroom or bathroom above
  • First-floor addition: Adding a storey above an existing single-storey element (like a garage)
  • Rear two-storey extension: Adding depth to both ground and first floors simultaneously

Front Extensions

Extensions to the front of properties (facing a highway) generally have the most restrictions under PD rights.

Limited PD Rights

Full extensions to the front of your house typically require planning permission. The PD rights here are limited to small additions like porches.

Porches Under PD Rights:

  • Maximum external floor area: 3 square meters
  • Maximum height: 3 meters
  • No part can be within 2 meters of a boundary adjacent to a highway
Diagram showing permitted development limits for porches

Porch dimensions allowed under PD rights

While full front extensions typically need planning permission, here are some options that may be possible under PD rights depending on your property's specific situation:

Potential Front PD Projects:

  • Bay windows: Adding or extending bay windows (as long as they project less than 1 meter)
  • Infilling recessed areas: Filling in recessed areas at the front that don't extend beyond the main front wall
  • Front extension on non-highway side: If your front doesn't face a highway (uncommon, but possible), normal side extension rules apply
Design Consideration

Even when a front extension requires planning permission, modest, well-designed additions that match the character of your property and street scene are more likely to be approved. Consider using an architect for front extensions that require planning permission.

General Restrictions for All Extensions

Regardless of the type of extension, these general restrictions apply to all extensions under Permitted Development rights:

Size Limits

  • Cannot cover more than 50% of the land around the original house
  • Maximum height limitations as detailed in each section
  • "Original house" means as built or as it stood on July 1, 1948

Appearance

  • Must use similar materials to the existing house
  • Roof pitch should match the existing house for two-storey extensions
  • No verandas, balconies, or raised platforms

Excluded Properties

  • Listed buildings
  • Properties where PD rights have been removed
  • Flats and maisonettes (no PD rights for extensions)

Location Restrictions

  • More limited PD rights in Conservation Areas
  • More limited PD rights in Areas of Outstanding Natural Beauty
  • More limited PD rights in National Parks

Building Regulations

While Permitted Development exempts you from planning permission, you will still need to comply with Building Regulations for any extension. These ensure your extension meets standards for:

  • Structural integrity
  • Fire safety
  • Ventilation
  • Energy efficiency
  • Electrical safety
  • Accessibility

You can apply for Building Regulations approval through your local authority building control department or through private approved inspectors.

Learn More About Building Regulations

Party Wall Considerations

If your extension involves building on or near a boundary with a neighbor, you may need to follow the Party Wall Act 1996 procedures. This typically involves:

  1. Serving notice on your neighbors (usually 1-2 months before work begins)
  2. Getting written agreement from them
  3. Appointing a surveyor if agreement can't be reached

Party wall agreements are separate from both planning and building regulations processes.

Note

This guide focuses on England's Permitted Development rights. Regulations in Wales, Scotland, and Northern Ireland have similarities but important differences. Always check with your local planning authority for region-specific guidance.